1. Storage Summary
  2. Cargo Shipped 2019
  3. Sheet X
  4. Drill Hose Logistics
  5. Cargo Summary
  6. All Cargo to NPX
  7. TraverseDetails

  B C D E F G H I
1                
2 IceCube Upgrade - Winter Storage Requirements
3 Type of Storage: Winter 2020 Winter 2021 Winter 2022
4 Weight Cube Weight Cube Weight Cube
5 McMurdo: Indoor, Heated - 0 - 0 - 0 - 0 1,800 192
6 McMurdo: Indoor, Unheated - 0 - 0 - 0 - 0 - 0 - 0
7 McMurdo: Outdoor 173,440 15,537 32,400 3,272 87,500 3,257
8 McMurdo: TOTAL 173,440 15,537 32,400 3,272 89,300 3,449
9
10 South Pole: Indoor, Heated - 0 - 0 - 0 - 0 12,150 1,975
11 South Pole: Indoor, Unheated - 0 - 0 - 0 - 0 - 0 - 0
12 South Pole: Outdoor - 0 - 0 - 0 - 0 5,000 352
13 South Pole: TOTAL - 0 - 0 - 0 - 0 17,150 2,327
14
15             7/19/2019
16 * All weight in pounds, all cube in feet          
17 ** This list does NOT include cargo considered "pass thru", requiring only temporary staging until movement to South Pole
18 *** Current plan reflects Drill Hose winter cold-store in ZCM 2021, and winter DNF at NPX in 2022  

Back to top


  A B C D E F
1 Date Crate ID DNF? ROS McMurdo ROS South Pole Contents
2 9/21/2019 MV-10 No 9313   Generator and PDM Upgrade Tools, Parts, Supplies
3 9/21/2019 ICU-01M DNF 9313   DNF Tools for McMurdo Gen and PDM Upgrade
4 9/21/2019 BAT-1M DNF 9313   DNF DeWalt 18V and 20V Batteries, Label Maker
5 9/21/2019 BAT-2 DNF   9327 DNF Batteries for Duvernois and Zernick
6 9/21/2019 CR-1 No   9327 2 Crescents for Drill Tower
7          
8 9/26/2019 ICU-02 No   9320 Jaemar Winch, HPP#4, Safety Equipment
9 9/26/2019 ICU-03 No   9320 50HP Motor and Stand, Fuel and Water Hoses, Driller Bike
10 9/26/2019 ICU-04 No   9320 Vacuum Canisters, Burner, Burner Repair Kit
11 9/26/2019 SN-1 No   9320 Snowmobile- Polaris Wide Track 550
12 9/26/2019 SN-2 No   9320 Snowmobile- Polaris Wide Track 550
13 9/26/2019 MV-11 No   9320 20' Container - ICU-02, ICU-03, ICU-04, SN-1, SN-2 Inside
14 9/26/2019 ICU-05 DNF   9320 DNF Safety Equipment
15 9/26/2019 ICU-06 DNF   9320 DNF Allen Bradley Motor Drives, Tools and Equipment

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF
1 Container Type Description of Container Contents Number of containers with same characteristics Individual Container Weight (lbs) Total Weight (lbs) L (in) W (in) H (in) Total Cubes (cf) Wt & Cu Confirmed? (L2/Date) Keep Dry Do Not Freeze (DNF) Hazardous Spec. Hndlg Drift? Shipping to NPX Origin Depart Origin Target Date Expected arrival at Port Hueneme (must meet RDD for ROS) Transit Time: Origin to PTH (days) Ship Method - PTH to Christchurch Ship Method to McMurdo (ZCM) Arrive ZCM Ship method to Pole (NPX) ROS date
to NPX
Total Transit Time:
PTH to NPX (days)
Long-Term
Storage Required?
Storage
Start Date
Storage
End Date
Storage Location
- South Pole
- McMurdo
- None
Storage
Season
Storage Type
- Indoor, Heated
- Indoor, Unheated
- Outdoor
 
2 Wood Spool Drill Hose (from PSL) (DNDF) 4@4800#, 350cu 4 4800 19,200 96 96 72 1,536 TH DNDF-ZCM Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 Indoor, Heated Cryo Storage
3 Wood Spool Drill Hose (from Italy) (DNDF) 8@4800#, 350cu 8 4800 38,400 96 96 72 3,072 TH DNDF-ZCM Yes Italy 11/1/2020 ComSur 2020 Vessel 2020 2/1/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 Indoor, Heated
4 Steel Spool Main Cable Assembly 87 1 15000 15,000 93 95 93 475 TDY 9/11/19 1 None No MSU 9/15/2021 9/30/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 Indoor, Heated
5 Steel Spool Main Cable Assembly 88 1 15000 15,000 93 95 93 475 TDY 9/11/19 1 None No MSU 9/15/2021 9/30/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022 Yes 2/5/2022 12/1/2022 South Pole Winter 2022 Indoor, Heated
6 Cardboard overcarton 108 mDOMs 87 - 88: overcartons of 4 units 27 250 6,750 48 48 36 1,296 1 1 None No DESY / MSU 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated Other Storage (B2 Mezanine?)
7 Cardboard overcarton 88 D-Eggs 87 - 88: overcartons of 4 units 22 250 5,500 48 48 36 1,056 1 1 None No Chiba 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
8 Cardboard overcarton 8 PDOMs 87 - 88: overcartons of 8 units 1 400 400 42 42 45 46 1 1 None No UW 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
9 Cardboard overcarton 28 POCAMs 87 - 93 7 200 1,400 42 42 30 214 1 None No Munich 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
10 Cardboard overcarton 12 Pencil Beams 87 - 93 3 200 600 42 42 30 92 1 None No UW 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
11 Wood Crate Special Devices 87 - 88 2 250 500 42 42 36 74 1 1 None No Various 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
12 Hardigg Case Depth Sensors (Paro) 87 - 93 1 400 400 30 30 24 13 1 None No PSL 0 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/1/2022   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated
13                                                            
14                                                  
15         103,150 8,349                                              

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM AN AO AP AQ AR AS AT AU AV AW AX
1     2019 2020 2021 2022 2023      
2 Drill Hose - Delivery Options O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S
3
4 Option-1
(Preferred)
5 New Hose, Procurement Procurement
6 New Hose, Drop Ship IVG (Italy) to CHC  - (9 spools) Ship/Store Vessel
7 PSL Hose, Vessel, PTH - ZCM  -  (4 spools) Vessel
8 Storage in McMurdo (Outdoor Cold)  -  (13 spools) Store McMurdo (Outdoor Cold)
9 Fly ZCM to NPX (9 spools), leave 4 spools in McMurdo FLY  
10 Install onto Hose reel at Pole, leave spares in McMurdo   Install
11 Storage at South Pole on hose reel   Store at NPX (DNDF on reel)
12 Fly ZCM to NPX (4 spools) Drill, Retro to Storage DRILL
13 Option-2
(Old-Preferred)
14 New Hose, Procurement Procurement
15 New Hose, Drop Ship IVG (Italy) to CHC  - (9 spools) Ship/Store Vessel
16 PSL Hose, Vessel, PTH - ZCM  -  (4 spools) Vessel
17 Storage in McMurdo (Outdoor Cold)  -  (13 spools) Store McMurdo (Outdoor Cold)
18 Fly ZCM to NPX  -  (13 spools) FLY
19 Storage at South Pole (Cryo?) - (13 spools) Store at NPX (DNF)
20 Install & Drill, Retro to Storage Install
21 Option-2
(Risky)
22 New Hose, Procurement Procurement  
23 New Hose, Drop Ship IVG (Italy) to CHC  - (9 spools) Ship/Store Vessel
24 PSL Hose, Vessel, PTH - ZCM  -  (4 spools) Vessel
25 Storage in McMurdo (Outdoor Cold) - (13 spools) Store in McMurdo (Outdoor Cold)
26 Fly ZCM to NPX   Fly
27 Install (just in time) & Drill, Retro to Storage
28 Option-3
(Not desired)
29 New Hose, Procurement Procurement  
30 New Hose, Drop Ship IVG (Italy) to CHC  - (9 spools) Ship - CHC
31 PSL Hose, Vessel, PTH - CHC - (4 spools) VSL
32 Storage in Christchurch, NZ Store in Christchurch
33 Fly CHC to ZCM (C-17)   C17
34 Fly ZCM to NPX   Fly
35 Install (just in time) & Drill, Retro to Storage

Back to top


  B C D E F G H
1              
2 Transport Summary by Method by Season (do not edit)
3 Method of Transport 2019/20 2020/21 2021/22 2022/23 TOTAL
4 Vessel to McMurdo - 0 94,800 87,500 - 0 182,300
5 ComSur to CHC - 0 73,825 71,350 42,300 187,475
6 ComAir to CHC - 0 - 0 3,000 3,600 6,600
7 C-17 to McMurdo - 0 30,625 86,150 45,900 162,675
8 Traverse ZCM to NPX - 0 110,840 51,200 - 0 162,040
9 Fly LC-130 ZCM to NPX - 0 40,025 152,600 192,625
10 Estimated Flights (23,800/ea) - 0 2 - 0 6 8
11 * All weight in pounds            
12              
13 - Traverse consists only of EHWD Generator modules, IFD, and over-sized SALSA equipment      
14 - Does NOT include fuel (cargo only)            

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG AH AI AJ AK AL AM
1 ID # WBS
L2
Container Type Description of Container Contents Number of containers with same characteristics Individual Container Weight (lbs) Total Weight (lbs) L (in) W (in) H (in) Total Cubes (cf) Wt & Cu Confirmed? (L2/Date) Keep Dry Do Not Freeze (DNF) Hazardous Spec. Hndlg Drift? Shipping to NPX Origin Depart Origin Target Date Expected arrival at Port Hueneme (must meet RDD for ROS) Transit Time: Origin to PTH (days) Ship Method - PTH to Christchurch Ship Method to McMurdo (ZCM) Arrive ZCM Ship method to Pole (NPX) Season Ship Priority, 1 = top priority and then count up Season Traverse Priority, 1 = top priority and then count up Traverse Note ROS date
to NPX
Total Transit Time:
PTH to NPX (days)
Long-Term
Storage Required?
Storage
Start Date
Storage
End Date
Storage Location
- South Pole
- McMurdo
- None
Storage
Season
Storage Type
- Indoor, Heated
- Indoor, Unheated
- Outdoor
Note Added information related to traverse  
2 3 1.2 Wood Crate Repair/Replacement Parts (2020/21), MHP, PHS, Pumps, MDS parts, 4 1000 4,000 96 48 48 512   1     None Yes PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/21/2020   No              
3 4 1.2 Wood Crate Repair/Replacement Parts (2020/21) - DO NOT FREEZE 1 1000 1,000 96 48 48 128   1 1   DNF No PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/21/2020   No                
4 5 1.2 ISO Container Generator-1 (at ZCM, came vessel Feb 2020) 1 22000 22,000 240 96 96 1,280 TH       None No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 2 SPOT1 11/28/2020   Yes 2/1/2020 11/1/2020 McMurdo Winter 2020 Outdoor      
5 6 1.2 Wood Crate Motor Drives, Control System Equipment (2020) 3 1500 4,500 96 48 48 384   1 1   DNF No PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/28/2020   No          
6 7 1.2 Sled/Skis UNL - Flat Rack/Ski-Sled System # 1 - 40'L, ISO2 (Gen2&3 on now) 1 20000 20,000 480 96 96 2,560         None N/A ZCM -- -- -- -- -- -- TBD TBD   Yes 10/1/2019 TBD McMurdo Winter 2020 Outdoor      
7 8 1.2 ISO Container Generator-2 (currently on 40' UNL Flat Rack #1 w/Gen3) -> move to ASC flatrack 1 22000 22,000 240 96 96 1,280 TH       None No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 1 SPOT1 11/28/2020   Yes 2/1/2020 11/1/2020 McMurdo Winter 2020 Outdoor      
8 9 1.2 ISO Container Generator-3 (currently on 40' UNL Flat Rack #1 w/Gen2) -> move to ASC flatrack 1 22000 22,000 240 96 96 1,280 TH       None No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 3 SPOT1 11/28/2020   Yes 2/1/2020 11/1/2020 McMurdo Winter 2020 Outdoor      
9 10 1.2 ISO Container UNL - Reel Container - 40' long, on ISO2 (NOT Hercable) 1 20000 20,000 480 96 96 2,560         None N/A ZCM -- -- -- -- -- -- TBD TBD   Yes 10/1/2019 TBD McMurdo Winter 2020/21 Outdoor      
10 11 1.2 ISO Container UNL - HPU-1 - 40' long, on ISO2-C (NOT Hercable) 1 28000 28,000 480 96 96 2,560         None N/A ZCM -- -- -- -- -- -- Traverse 2020 10 SPOT1 12/26/2020   Yes 10/1/2019 12/31/2020 McMurdo Winter 2020 Outdoor      
11 12 1.2 ISO Container UNL - HPU-2 - 40' long, on ISO2 (NOT Hercable) 1 28000 28,000 480 96 96 2,560         None N/A ZCM -- -- -- -- -- -- TBD TBD   Yes 10/1/2019 TBD McMurdo Winter 2020/21 Outdoor      
12 13 1.2 Sled/Skis UNL - Flat Rack/Ski-Sled System #3 - 20'L (can not locate) 1 14000 14,000 240 96 96 1,280         None N/A ZCM -- -- -- -- -- -- Traverse 2021 TBD   Yes 10/1/2019 TBD McMurdo Winter 2020 Outdoor      
13 14 1.2 Sled/Skis UNL - Flat Rack/Ski-Sled System #2 - 40'L, ISO2 (Fuel tower, panel, on now) 1 20000 20,000 480 96 96 2,560         None N/A ZCM -- -- -- -- -- -- TBD TBD   Yes 10/1/2019 TBD McMurdo Winter 2020 Outdoor      
14 15 1.2 Loose Equip Fuel Tower, Day Tank (currently on UNL flat rack #2) -> move to ASC flatrack 1 1500 1,500 96 72 120 480         None Yes ZCM -- -- -- -- -- -- Traverse 2020 4 SPOT1 11/28/2020   Yes 2/1/2020 11/1/2020 McMurdo Winter 2020 Outdoor      
15 16 1.2 Loose Equip Electrical Panels (on UNL flat rack #2 - remove and fly to NPX 11/19) 2 400 800 48 48 96 256         None Yes ZCM -- -- -- -- -- -- Air 2020 11/21/2020   No          
16 17 1.2 Loose Equip Hose Crimper (on UNL flat rack) - retroed to WI 20/21, will ship back in crate 1 800 800 36 36 72 54         None Yes PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/21/2020   No          
17 18 1.2 Loose Equip Cable Tensioner (Bull Wheel) 1 800 800 48 48 72 96         None Yes PSL 8/30/2021 9/14/2021 15 ComSur2021 C17-2021 11/1/2021 Traverse 2021 3 SPOT2 12/31/2021   No          
18 19 1.2 Secure Equip Independent Firn Drill (IFD) 1 11972 11,972 264 94 97 1,393 TB 4/7/20       Glycol No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 7 SPOT1 12/26/2020   Yes 2/1/2020 12/31/2020 McMurdo Winter 2020 Outdoor      
19 20 1.2 Loose Equip 287B Cat Skidsteer 1 9600 9,600 96 96 96 512         None Yes ZCM 11/1/2020 -- -- -- -- -- Air 2020 12/31/2020   Yes 2/1/2020 12/31/2020 McMurdo Winter 2020 Outdoor      
20 21 1.2 Loose Equip Snowmobiles x 2 2 1100 2,200 96 48 48 256         None Yes PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
21 22 1.2 Wood Crate Filtration Sub-Components, Spares 1 2000 2,000 96 48 48 128         None Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 11/20/2021   Yes 2/1/2021 11/20/2021 McMurdo Winter 2021 Outdoor      
22 23 1.2 Wood Crate Computers, Networking Equipment (DNF) 2 500 1,000 48 48 48 128   1 1   DNF No PSL 9/18/2021 10/1/2021 13 ComAir 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No                
23 24 1.2 Wood Crate Motor Drives, Control System Equipment 2 1000 2,000 96 48 48 256   1 1   DNF No PSL 9/18/2021 10/1/2021 13 ComAir 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No          
24 25 1.2 Wood Crate Repair/Replacement Parts (2021-22), Pumps, Replacement Parts 4 1500 6,000 96 48 48 512         None Yes PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No                
25 26 1.2 Wood Crate Repair/Replacement Parts (2021/22) - DO NOT FREEZE 1 400 400 48 48 48 64   1 1   DNF No PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No                
26 27 1.2 Wood Crate Cables, Main Feeder, Bldg Interconnects 2 2500 5,000 96 48 48 256         None Yes PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No                
27 28 1.2 Wood Crate TOS/Tower Refabricated items 1 2000 2,000 96 48 48 128         None Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 11/27/2021   Yes 2/1/2021 11/27/2021 McMurdo Winter 2021 Outdoor      
28 29 1.2 Wood Crate MSHR Spare Parts 1 1500 1,500 48 48 48 64         None Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 11/27/2021   Yes 2/1/2021 11/27/2021 McMurdo Winter 2021 Outdoor      
29 30 1.2 Drums Glycol - Provided by ASC? (4x55 gal) 1 2000 2,000 72 72 72 216 TH       Glycol Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 12/31/2021   Yes 2/1/2021 11/27/2021 McMurdo Winter 2021 Outdoor      
30 31 1.2 Wood Crate Drill Head 1 600 600 192 24 24 64 TH   1   DNF No PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 2/5/2022 McMurdo Winter 2022 Indoor, Heated      
31 32 1.2 Wood Crate Drill Head 1 600 600 192 24 24 64 TH   1   DNF No PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 2/5/2022 McMurdo Winter 2022 Indoor, Heated    
32 33 1.2 Wood Crate Drill Head 1 600 600 192 24 24 64 TH   1   DNF No PSL 9/18/2021 10/1/2021 13 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 2/5/2022 McMurdo Winter 2022 Indoor, Heated    
33 34 1.2 Secure Equip Main Drill Cable Reel (with drill cable) 1 8000 8,000 192 96 96 1,024         None Yes PSL 8/30/2021 9/14/2021 15 ComSur2021 C17-2021 11/1/2021 Traverse 2021 1 SPOT2 12/31/2021   No          
34 35 1.2 Wood Spool Cable, Drill, Spare on Spool 1 3000 3,000 72 72 72 216         None Yes PSL 8/30/2021 9/14/2021 15 ComSur2021 C17-2021 11/1/2021 Traverse 2021 7 SPOT2 12/31/2021   No          
35 36 1.2 Secure Equip Return Water Cable Reel 1 3500 3,500 72 72 72 216         None Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 2 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
36 37 1.2 Wood Spool Cable, Combo 1 3000 3,000 72 72 72 216         None Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 8 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
37 38 1.2 Wood Crate Repair/Replacement Parts (2022/23), Last minute Parts 2 1500 3,000 96 48 48 256         None Yes PSL 9/18/2022 10/1/2022 13 ComAir 2022 C17-2022 11/9/2022 Air 2022 11/16/2022   No                
38 39 1.2 Wood Crate Repair/Replacement Parts (2022/23) - DO NOT FREEZE 1 600 600 96 48 48 128     1   DNF No PSL 9/18/2022 10/2/2022 14 ComAir 2022 C17-2022 11/9/2022 Air 2022 11/16/2022   No                
39 40 1.2 Wood Spool Drill Hose (from PSL) (DNDF) 4@4800#, 350cu 4 4800 19,200 92 92 72 1,411 TH       DNDF-ZCM Yes PSL 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Air 2022 11/16/2022   Yes 2/1/2021 12/1/2022 McMurdo Winter 2021/2022 DNDF, min -50C      
40 41 1.2 Wood Spool Drill Hose (from Italy) (DNDF) 9@4800#, 350cu 9 4800 43,200 92 92 72 3,174 TH       DNDF-ZCM Yes Italy 8/1/2020   ComSur 2020 Vessel 2020 2/1/2021 Air 2021 11/27/2021   Yes 2/1/2021 12/1/2021 McMurdo Winter 2021 DNDF, min -50C Heated on Hose reel at NPX Winter 2022    
41 42 1.4 Wood Crate String Hardware 87 - 88 2 1500 3,000 96 48 48 256   1     None Yes PSL 9/1/2021 9/16/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Outdoor      
42 43 1.4 Wood Crate String Hardware 89 - 93 5 1500 7,500 96 48 48 640   1     None Yes PSL 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
43 44 1.4 Wood Crate Deployment Weights 87 - 93 7 500 3,500 36 24 24 84 N 1     None Yes PSL 11/15/2020 11/30/2020 15 Vessel 2020 Vessel 2020 2/1/2021 Air 2021 2/5/2022   Yes 2/1/2021 2/5/2022 McMurdo Winter 2021 Outdoor      
44 45 1.4 Steel Spool Main Cable Assembly 87 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     DNDF No MSU 9/15/2021 9/30/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 DNDF, min -40C      
45 46 1.4 Steel Spool Main Cable Assembly 88 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     DNDF No MSU 9/15/2021 9/30/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 DNDF, min -40C      
46 47 1.4 Steel Spool Main Cable Assembly 89 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
47 48 1.4 Steel Spool Main Cable Assembly 90 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
48 49 1.4 Steel Spool Main Cable Assembly 91 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
49 50 1.4 Steel Spool Main Cable Assembly 92 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
50 51 1.4 Steel Spool Main Cable Assembly 93 1 15000 15,000 93 95 93 475 TDY 9/11/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
51 52 1.4 Wood Crate Breakout Cable Assemblies 87 - 88 2 1000 2,000 72 48 24 96 TDY 6/6/19 1     None No MSU 9/1/2021 9/16/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 2/5/2022 12/1/2022 South Pole Winter 2022 Outdoor      
52 53 1.4 Wood Crate Breakout Cable Assemblies 89 - 93 5 1000 5,000 72 48 24 240 TDY 6/6/19 1     None No MSU 11/15/2021 11/30/2021 15 Vessel 2021 Vessel 2021 2/1/2022 Air 2022 11/26/2022   Yes 2/1/2022 11/26/2022 McMurdo Winter 2022 Outdoor      
53 54 1.4 Wood Crate Surface Cable Assemblies 87 - 93 7 1000 7,000 72 72 72 1,512 TDY 6/6/19 1     None No MSU 9/1/2021 9/16/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No     None None None      
54 55 1.4 Wood Crate Surface Junction Boxes 87 - 93 2 1000 2,000 96 48 48 256 TDY 6/6/19 1     None No MSU 9/1/2021 9/16/2021 15 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   No     None None None      
55 56 1.3 Cardboard overcarton 111 + 17 spares mDOMs 87 - 88: overcartons of 8 units 16 500 8,000 40 48 46 818   1 1   DNF No DESY / MSU     0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated      
56 57 1.3 Cardboard overcarton 78 + 18 spares D-Eggs 87 - 88: overcartons of 8 units 12 250 3,000 40 48 66 880   1 1   DNF No Chiba     0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated      
57 58 1.3 Cardboard overcarton 2 PDOMs + 3 Pencil Beams + 3 spares for 87 - 88: overcarton of 8 just like in Gen1 1 400 400 42 42 45 46   1 1   DNF No UW     0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated      
58 59 1.3 Wood Crate 21 Special Devices of 7 types (excluding PDOMs and Pencil Beams) 87 - 88 3 250 750 42 48 66 231   1 1   DNF No Various     0 ComSur 2021 C17-2021 11/13/2021 Air 2021 11/20/2021   Yes 11/13/2021 12/1/2022 South Pole Winter 2022 Indoor, Heated      
59 60 1.5 Cardboard overcarton 17 + XX spares POCAMs 89 - 93 (TO BE UPDATED) 7 200 1,400 42 42 30 214   1       No Munich     0 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 12/1/2022 South Pole None        
60 61 1.5 Cardboard overcarton 8 + XX spares Pencil Beams 89 - 93 (TO BE UPDATED) 3 200 600 42 42 30 92   1       No UW 8/31/2021 9/16/2021 16 ComSur 2021 C17-2021 11/13/2021 Air 2021 2/5/2022   Yes 11/13/2021 12/1/2022 South Pole None        
61 62 1.3 Cardboard overcarton 285 + 11 spares mDOMs 89 - 93 overcartons of 8 37 500 18,500 48 48 36 1,776   1       No DESY / MSU     0 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No       None        
62 63 1.3 Cardboard overcarton 197 + 11 spares D-Eggs 89 - 93 overcartons of 8 26 500 13,000 48 48 36 1,248   1       No Chiba     0 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No       None        
63 64 1.3 Cardboard overcarton 12 PDOMs 89-93 + 8 PBS overcartons of 8 (like Gen1) + 4 spares in total (TBD) 3 400 1,200 42 42 45 138   1       No UW     ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No       None        
64 65 1.3 Wood Crate 58 Special Devices 89-93 (7 types, no PB, no pDOM) + 6 spares in total (TBD) overcartons or crates of 8 8 300 2,400 42 42 36 294   1       No Various     0 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No       None        
65 66 1.4 Wood Crate Field Hubs 87 - 93 1 2000 2,000 96 48 48 128 TDY 6/5/19 1 1   DNF No DESY 9/1/2022 9/25/2022 24 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No         Indoor, Heated (ICL)      
66 67 1.6 Wood Crate Miscellaneous Scientific Equipment 2 1500 3,000 48 48 48 128 EKB - May 21 1 1   DNF No UW     0 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No                
67 68 1.6 Wood Crate Computing Infrastructure 2 1100 2,200 96 48 48 256 EKB - May21 1 1   DNF No UW     0 ComSur 2022 C17-2022 11/10/2022 Air 2022 11/19/2022   No                
68 69 1.2 ISO Container 20' Milvan Container (empty) 1 4000 4,000 240 96 96 1,280         None Yes ZCM 12/1/2020 -- -- -- -- -- Traverse 2021 9 SPOT2 12/31/2021   Yes 2/1/2020 12/31/2021 McMurdo Winter 2020/21 Outdoor      
69 70 1.2 Loose Equip Generator Hoods in ZCM (2x exhaust) (currently on UNL flat rack #2) -> move to ASC flatrack 2 200 400 72 36 36 108         None Yes ZCM -- -- -- -- -- -- Traverse 2020 5 SPOT1 11/28/2020   Yes 2/1/2020 11/1/2020 McMurdo Winter 2020 Outdoor      
70 71 1.2 Loose Equip Generator Hoods new (5x) 5 300 1,500 108 36 48 540         None Yes UW 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 4 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
71 72 1.2 Loose Equip Independent Firn Drill (IFD) Sheave (in ZCM) 1 920 920 97 44 63 156 TB 4/7/20       None No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 8 SPOT1 12/26/2020   Yes 2/1/2020 12/31/2020 McMurdo Winter 2020 Outdoor      
72 73 1.2 Wood Crate Independent Firn Drill (IFD) Drillhead (in ZCM) 1 1048 1,048 125 33 37 88 TB 4/7/20       None No ZCM 11/1/2020 -- -- -- -- -- Traverse 2020 9 SPOT1 12/26/2020   Yes 2/1/2020 12/31/2020 McMurdo Winter 2020 Outdoor      
73 74 1.2 Wood Crate Independent Firn Drill (IFD) DNF 1 500 500 36 36 36 27   1 1   DNF No UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/26/2020   No          
74 75 1.2 Loose Equip TU-20 Shaft 1 400 400 120 48 24 80         None Yes UW 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 10 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
75 76 1.2 Hartigg Antarctic Rodwell Aparatus DNF 1 400 400 36 36 36 27   1 1   DNF No UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
76 77 1.2 Wood Crate Antarctic Rodwell Aparatus Drillheads 1 825 825 120 25 30 52         None No UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
77 78 1.2 Secure Equip Antarctic Rodwell Aparatus White Generator 1 3000 3,000 168 96 96 896         None No UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
78 79 1.2 Wood Crate Antarctic Rodwell Aparatus Crate 1 2500 2,500 96 48 48 128         None Yes UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
79 80 1.2 Pallet Fall Restraints 1 1500 1,500 96 48 48 128         None Yes UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/21/2020   No          
80 81 1.2 Pallet 20' Skis (5x sets) - stack onto Generator buildings 1 1000 1,000 240 96 48 640         None Yes UW 8/30/2020 9/14/2020 15 ComSur 2020 C17-2020 11/1/2020 Traverse 2020 6 SPOT1 11/28/2020   No          
81 82 1.2 Loose Equip 287B Forks 1 400 400 72 77 36 116 TB 4/7/20       None Yes UW 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 12/31/2020   No          
82 83 1.2 ISO Container DOM Handling Facility (DHF) 1 12000 12,000 240 96 96 1,280         None Yes UW 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 5 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
83 84 1.2 Pallet DOM Sleds (2x) 1 1000 1,000 240 96 24 320         None Yes UW 11/1/2020 11/11/2020 10 Vessel 2020 Vessel 2020 2/1/2021 Traverse 2021 6 SPOT2 12/31/2021   Yes 2/1/2021 12/31/2021 McMurdo Winter 2021 Outdoor      
84 85 1.2 Mini Milvan Repair/Replacement Parts (2020/21), MHP, PHS, Pumps, MDS parts, 2 4000 8,000 96 96 96 1,024         None Yes PSL 9/25/2020 10/5/2020 10 ComSur 2020 C17-2020 11/14/2020 Air 2020 11/21/2020   No          
85                    
86                                                                          
87 TOTAL by AIR to NPX via Herc 215 321,175 24,073                  
88   TOTAL by TRAVERSE to NPX via SPoT2, SPoT3 or Science 26 162,040 15,813                  
89   GRAND TOTAL 241 483,215 39,886                  
90                                                                              
91                                                                              
92 Change Log:                                                                        
93 1. Changed all instrumentation to air between McMurdo and Pole. Keep it simple. Hutch 6/4/19                                                                    
94 2. Added Storage requirements columns. Hutch 6/5/19                                                                      
95 3. Changed Gen3 and PDM transport method from Traverse to Air 2020, also changed ROS to earlier. Hutch 11/20/19                                                                  
96 4. Added 2 UNL Flat Racks (40' and 20') for traversing IceCube equipment to NPX in 2020. Hutch 11/20/219                                                                    
97 5. Added UNL - HPU#2 (40' container). Hutch 11/20/19                                                                      
98 6. Reworked all Implementation cargo. Hutch 2/7/20                                                                      
99 7. Complete rework of all Implementation cargo, added items 70-84. Benson 4/8/2020                                                                      
100 8. Had to swap color coding of ship method (blue <-> green) to match now established TraverseDetails tab. Benson 4/8/2020                                                                
101 9. More adjustments to implementation cargo, mainly traverse items. Benson 4/8/2020                                                                      
102 10. Reduced ID#3 qty from 6 to 4, added ID#85 qty 2. Flagged red until updated in 20/21 SIP - unflag when SIP updated. Benson 4/15/2020 (unflagged Benson 4/23)                                                    
103 11. Updated drill hose logistics (ID#40&41)                                                                      

Back to top


  A B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA
1 TRAVERSE (ONLY) DETAILS
2 4/8/2020  
3 Postion = 40'
4 (X) = backup plan
5     2020-2021 2021-2022
6 ID From All Cargo to NPX tab Item 2020 Location Priority LC130 TRAVERSE LC130 TRAVERSE
7 SPOT 1 SPOT 2 SPOT 3 SPOT 1 SPOT 2 SPOT 3
8 Position 1 Position 2 Position 3 Position 4 Position 1 Position 2 Position 3 Position 1 Position 2 Position 3 Position 1 Position 2 Position 3 Position 1 Position 2 Position 3 Position 1 Position 2 Position 3
9 8 Generator 2 McM 1 on UNL flatrack 1 with ISO2. Need to move onto ASC flatrack. Needs alum skis @ NPX X
10 5 Generator 1 McM 2 Need to move onto ASC flatrack. Needs alum skis @ NPX. X
11 9 Generator 3 McM 3 on UNL flatrack 1 with ISO2. Need to move onto ASC flatrack. Needs alum skis @ NPX X
12 15 Fuel Tower Day Tank McM 4 on UNL flatrack 2 with ISO2, bolted and strappped, 1/2 full. Need to move onto ASC flatrack X
13 70 Gen Hoods in ZCM (2x exhaust) McM 5 on UNL flatrack 2 with ISO2. Need to move onto ASC flatrack. X
14 81 20' Skis (5x sets) PSL 6 Need to arrive before or with Generators, STACK on top of generators X X
15 19 Independent Firn Drill (IFD) McM 7 Need to move onto ASC flatrack. Herc = waiver? X
16 72 IFD Sheave McM 8 Need to move onto ASC flatrack X
17 73 IFD Head McM 9 Need to move onto ASC flatrack X
18 11 HPU1 (UNL) McM 10 Repair needed at ZCM (2020). Already on ISO2-C X
19 34 Main Drill Cable Reel (MDCR) PSL 1 Large heavy winch X
20 36 Return Water Cable Reel PSL 2 Large heavy winch X
21 18 Cable Tensioner (Bull Wheel) PSL 3 Large heavy winch X
22 71 Gen Hoods NEW (5x) PSL 4 Put some Gen Hoods and TU20 shaft inside empty milvan (ID 69) X
23 83 DOM Handling Facility (DHF) PSL 5 20' MECC-style (for now) - on 2020/21 vessel, 21/22 traverse X
24 84 DOM sleds (2x) PSL 6 Needed at Pole 21/22 X
25 35 Drill cable (spare) PSL 7 Large wooden spool X
26 37 Spare Combo Cable PSL 8 Large wooden spool X
27 69 20' Milvan Container (empty) McM 9 Put some Gen Hoods (ID 71) inside X
28 75 TU20 Shaft PSL 10 Long pallet, put inside empty milvan (ID 69) X
29 7 UNL Flatrack 1 with ISO2 McM Stack with Flatrack 2 + 2sets ISO2. Reassessing need at Pole
30 14 UNL Flatrack 2 with ISO2 McM Stack with Flatrack 1 + 2sets ISO2. Reassessing need at Pole
31 12 HPU2 (UNL) McM Repair needed at ZCM (?), put on ISO3 to traverse DO NOT LIFT. Maybe extract heaters and leave container
32 10 RCU (UNL) McM Repair needed at ZCM (?), put on ISO3 to traverse. Reassessing need at Pole