Labor Cat.
|
Names
|
WBS Level 3
|
Tasks
|
WBS 2.1
|
WBS 2.2
|
WBS 2.3
|
WBS 2.4
|
WBS 2.5
|
WBS 2.6
|
Grand Total
|
|
Detector Maintenance & Operations
|
Computing & Data Management
|
Data Processing & Simulation
|
Software
|
Calibration
|
|||||
KE
|
Andreas Haungs | Administration | Coordination | 0.10
|
0.10
|
|||||
Surface Detector | Co-task leader scintillators | 0.10
|
0.10
|
|||||||
HAUNGS, ANDREAS Total | 0.10
|
0.10
|
0.20
|
|||||||
Ralph Engel | Administration | Coordination | 0.10
|
0.10
|
||||||
ENGEL, RALPH Total | 0.10
|
0.10
|
||||||||
SC | Harald Schieler | Surface Detector | Construction (scintillator) | 0.10
|
0.10
|
|||||
SCHIELER, HARALD Total | 0.10
|
0.10
|
||||||||
Donghwa Kang | Computing & Data management | Middleware Setup | 0.15
|
0.15
|
||||||
Simulation prooduction | Surface simulations | 0.15
|
0.15
|
|||||||
KANG, DONGHWA Total | 0.15
|
0.15
|
0.30
|
|||||||
SC (not graduated) | Weindl | Detector | DAQ surface | 0.30
|
0.30
|
|||||
Software | Software surface | 0.15
|
0.15
|
|||||||
WEINDL, ANDREAS Total | 0.30
|
0.15
|
0.45
|
|||||||
PO | Aswathi Balagopal | Simulation Production | Validation and Monitoring data sets | 0.20
|
0.20
|
|||||
BALAGOPAL, ASWATHI Total | 0.20
|
0.20
|
||||||||
GR
|
Thomas Huber | Surface Detector | Szintillator operation | 0.20
|
0.10
|
0.30
|
||||
Max Renschler | Surface Detector | Radio operation | 0.20
|
0.10
|
0.30
|
|||||
Agnieszka Lesczcynska | Surface Detector | Scintillator performance | 0.10
|
0.20
|
0.30
|
|||||
Marie Oehler | Surface Detector | Scintillator operation | 0.20
|
0.20
|
||||||
Roxanne Turcotte | Surface Detector | Radio operation | 0.20
|
0.20
|
||||||
GR Total | 0.80
|
0.10
|
0.20
|
0.20
|
1.30
| |||||
KIT Total
|
0.20
|
1.30
|
0.15 | 0.45 | 0.35
|
0.20
|
2.65
|
Labor Cat.
|
Names
|
WBS L3
|
Tasks
|
Funds Source
|
WBS 1.1
|
WBS 1.2
|
WBS 1.3
|
WBS 1.4
|
WBS 1.5
|
WBS 1.6
|
Grand Total
|
Project Office
|
Gen2 EHWD
|
Deep Ice Sensor Modules
|
Comms Power Timing
|
Calibration and Characterization
|
M&O Data Systems Integration
|
||||||
SC
|
Schieler, Harald | 1.3.1 mDOM | PMT characterization | Inst. In-Kind
|
0.20 | 0.20
|
|||||
Schieler, Harald Total | 0.20
|
0.20
| |||||||||
KIT Total | 0.20
|
HAUNGS Enhancement of surface array, cosmic ray analysis, R&D for Gen2
Co-task leader ‘Scintillators’
ENGEL - Multi-Messenger Physics with IceCube
SCHIELER Coordination of Hardware Contribution at KIT and DAQ systems; PMTs fro mDOM
KANG Surface analysis (cosmic ray composition, gamma ray search); cosmic ray simulations
BALAGOPAL Surface and Veto physics; data analysis; reconstruction software development; simulations
NN (POSTDOC ERC) – start in late 2019, surface radio array
WEINDL DAQ systems (IceTaxi, Radio enhancement) Software development, Detector and data monitoring
HUBER (counted also in DESY) R&D of scintillator upgrade; data analysis and reconstruction
RENSCHLER Radio antennas as enhancement of IceTop
LESCZCYNSKA Scintillator array simulation and reconstruction
OEHLER Development of hybrid surface array, hard- and software
TURCOTTE (PHD RADIO ERC) – will start in August 2019 (Ice Surface Radio)
Computing Resources
2019
2020
|
| |||
CPU Cores | GPU Cards | CPU Cores | GPU Cards | |
Pledged resources in the IceCube common cluster
(local and shared with Auger group) |
480 cores | 2x2 NVIDIA TESLA V100 32GB | Evaluated in summer 2019 | Evaluated in summer 2019 |
Access to GridKA (Tier 1) & large-scale BW- cluster
|
matter of negotiation | matter of negotiation | Evaluated in summer 2019 | Evaluated in summer 2019 |
KIT_MoU_SOW_2019.0226