|   | 
Labor Cat.
 
 | 
Names
 
 | 
WBS Level 3
 
 | 
Tasks
 
 | 
WBS 2.1
 
 | 
WBS 2.2
 
 | 
WBS 2.3
 
 | 
WBS 2.4
 
 | 
WBS 2.5
 
 | 
WBS 2.6
 
 | 
Grand Total
 
 | 
  | 
Detector Maintenance & Operations
 
 | 
Computing & Data Management 
 
 | 
Data Processing & Simulation 
 
 | 
Software
 
 | 
Calibration
 
 | 
|||||
| KE
 | 
Andreas Haungs | Administration | Coordination | 0.10
 
 | 
0.10
 
 | 
|||||
| Surface Detector | Co-task leader scintillators | 0.10
 
 | 
0.10
 
 | 
|||||||
| HAUNGS, ANDREAS Total | 0.10
 
 | 
0.10
 
 | 
0.20
 
 | 
|||||||
| Ralph Engel | Administration | Coordination | 0.10
 
 | 
0.10
 
 | 
||||||
| ENGEL, RALPH Total | 0.10
 
 | 
0.10
 
 | 
||||||||
| SC | Harald Schieler | Surface Detector | Construction (scintillator) | 0.10
 
 | 
0.10
 
 | 
|||||
| SCHIELER, HARALD Total | 0.10
 
 | 
0.10
 
 | 
||||||||
| Donghwa Kang | Computing & Data management | Middleware Setup | 0.15
 
 | 
0.15
 
 | 
||||||
| Simulation prooduction | Surface simulations | 0.15
 
 | 
0.15
 
 | 
|||||||
| KANG, DONGHWA Total | 0.15
 
 | 
0.15
 
 | 
0.30
 
 | 
|||||||
| SC (not graduated) | Weindl | Detector | DAQ surface | 0.30
 
 | 
0.30
 
 | 
|||||
| Software | Software surface | 0.15
 
 | 
0.15
 
 | 
|||||||
| WEINDL, ANDREAS Total | 0.30
 
 | 
0.15
 
 | 
0.45
 
 | 
|||||||
| PO | Aswathi Balagopal | Simulation Production | Validation and Monitoring data sets | 0.20
 
 | 
0.20
 
 | 
|||||
| BALAGOPAL, ASWATHI Total | 0.20
 
 | 
0.20
 
 | 
||||||||
| GR
 | 
Thomas Huber | Surface Detector | Szintillator operation | 0.20
 
 | 
0.10
 
 | 
0.30
 
 | 
||||
| Max Renschler | Surface Detector | Radio operation | 0.20
 
 | 
0.10
 
 | 
0.30
 
 | 
|||||
| Agnieszka Lesczcynska | Surface Detector | Scintillator performance | 0.10
 
 | 
0.20
 
 | 
0.30
 
 | 
|||||
| Marie Oehler | Surface Detector | Scintillator operation | 0.20
 
 | 
0.20
 
 | 
||||||
| Roxanne Turcotte | Surface Detector | Radio operation | 0.20
 
 | 
0.20
 
 | 
||||||
| GR Total | 0.80
 
 | 
0.10
 
 | 
0.20
 
 | 
0.20
 
 | 
1.30
 
 | |||||
| KIT Total
 | 
0.20
 
 | 
1.30
 
 | 
0.15 | 0.45 | 0.35
 
 | 
0.20
 
 | 
2.65
 
  | 
|||
Labor Cat.
 
 | 
Names
 
 | 
WBS L3
 
 | 
Tasks
 
 | 
Funds Source
 
 | 
WBS 1.1
 
 | 
WBS 1.2
 
 | 
WBS 1.3
 
 | 
WBS 1.4
 
 | 
WBS 1.5
 
 | 
WBS 1.6
 
 | 
Grand Total
 
 | 
Project Office
 
 | 
Gen2 EHWD
 
 | 
Deep Ice Sensor Modules
 
 | 
Comms Power Timing
 
 | 
Calibration and Characterization
 
 | 
M&O Data Systems Integration
 
 | 
||||||
| SC
 | 
Schieler, Harald | 1.3.1 mDOM | PMT characterization | Inst. In-Kind
 
 | 
0.20 | 0.20
 
 | 
|||||
| Schieler, Harald Total | 0.20
 
 | 
0.20
 
 | |||||||||
| KIT Total | 0.20
 
  | 
||||||||||
HAUNGS Enhancement of surface array, cosmic ray analysis, R&D for Gen2
Co-task leader ‘Scintillators’
ENGEL - Multi-Messenger Physics with IceCube
SCHIELER Coordination of Hardware Contribution at KIT and DAQ systems; PMTs fro mDOM
KANG Surface analysis (cosmic ray composition, gamma ray search); cosmic ray simulations
BALAGOPAL Surface and Veto physics; data analysis; reconstruction software development; simulations
NN (POSTDOC ERC) – start in late 2019, surface radio array
WEINDL DAQ systems (IceTaxi, Radio enhancement) Software development, Detector and data monitoring
HUBER (counted also in DESY) R&D of scintillator upgrade; data analysis and reconstruction
RENSCHLER Radio antennas as enhancement of IceTop
LESCZCYNSKA Scintillator array simulation and reconstruction
OEHLER Development of hybrid surface array, hard- and software
TURCOTTE (PHD RADIO ERC) – will start in August 2019 (Ice Surface Radio)
Computing Resources
2019
 2020
 | 
 | |||
| CPU Cores | GPU Cards | CPU Cores | GPU Cards | |
| Pledged resources in the IceCube common cluster
 (local and shared with Auger group)  | 
480 cores | 2x2 NVIDIA TESLA V100 32GB | Evaluated in summer 2019 | Evaluated in summer 2019 | 
| Access to GridKA (Tier 1) & large-scale BW- cluster
 | 
matter of negotiation | matter of negotiation | Evaluated in summer 2019 | Evaluated in summer 2019 | 
KIT_MoU_SOW_2019.0226