|
Last updated: September 29, 2015
IceCube Institutional Memorandum Of Understanding (MOU)
University of Gent
Dirk Ryckbosch
Ph.D Scientists (Faculty Scientist/Post Doc Grads): 2 (1 1 3)
Scope of Work
Labor Cat.
|
Names
|
WBS L3
|
Tasks
|
WBS 2.1
|
WBS 2.2
|
WBS 2.3
|
WBS 2.4
|
WBS 2.5
|
Grand Total
|
Program Management
|
Detector Maintenance & Operations
|
Computing & Data Management
|
Triggering & Filtering
|
Data Quality, Reconstruction & Simulation Tools
|
|||||
SC | UGENT SC | Engineering and R&D Support | Acoustic R&D Support | 0.05
|
0.05
|
||||
UGENT SC Total | 0.05
|
0.05
|
|||||||
GR | UGENT GR | Detector Monitoring | Detector Monitoring | 0.03
|
0.03
|
||||
Engineering and R&D Support | Acoustic R&D Support | 0.05
|
0.05
|
||||||
Simulation Programs | Support IceTop Simulations, IceTop Calibrations, IceTop Reconstruction | 0.40
|
0.40
|
||||||
UGENT GR Total | 0.05
|
0.03
|
0.40
|
0.48
| |||||
UGENT Total | 0.10
|
0.03
|
0.40
|
0.53
|
Faculty:
Dirk Ryckbosch Institutional lead
Scientists and Post Docs:
Mathieu Labare Tau-neutrino simulationsAnalysis topics: Tau-neutrinos
Ph.D. Students:
Matthias Vraeghe DOM CalibrationThesis/Analysis topics: Tau-neutrinos: double-bang events
Sam De Ridder IceTop simulations, IceTop-InIce reconstructionsThesis/Analysis topics: Cosmic ray energy spectrum and composition; 3-year analysis; inclined showers
Sander Vanheule Thesis/Analysis topics: PINGU detector development
Diploma/Master Students:
Jeroen Van Houtte Multiyear cosmic ray spectrum in IceTop
Jasper Ryvers Timesynchronisation of signals in IceCube cable
Page 1 of 1
Gent_MoU_SOW_2015.0929.docx